DocumentCode :
2759761
Title :
Earliness/Tardiness Scheduling Problem under Uncertainty Based on Grey Chance Constrained Programming
Author :
Li, Bing ; Gu, Xingsheng
Author_Institution :
Res. Inst. of Autom., East China Univ. of Sci. & Technol., Shanghai
Volume :
2
fYear :
0
fDate :
0-0 0
Firstpage :
7272
Lastpage :
7276
Abstract :
Earliness/tardiness (E/T) scheduling problem under uncertainty are studied in this paper. The main work is to investigate the flow shop scheduling problem with distinct due windows. Uncertain processing time is expressed by grey number. The concept and method of grey simulation was put forward and grey simulation method was used to give the solution method for grey chance constrained programming. Finally, mathematical model for E/T flow shop scheduling which includes grey parameters is studied in details and how to use grey simulation technology to get the best result based on genetic algorithm is introduced. The effectiveness of the model and method is verified by simulation results
Keywords :
flow shop scheduling; genetic algorithms; grey systems; earliness-tardiness scheduling problem; flow shop scheduling; genetic algorithm; grey chance constrained programming; grey simulation; Automatic programming; Automation; Electronic mail; Genetic algorithms; Intelligent control; Job shop scheduling; Mathematical model; Uncertainty; Earliness/Tardiness (E/T); Flow shop scheduling; grey chance constrained programming; grey simulation; uncertainty;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Intelligent Control and Automation, 2006. WCICA 2006. The Sixth World Congress on
Conference_Location :
Dalian
Print_ISBN :
1-4244-0332-4
Type :
conf
DOI :
10.1109/WCICA.2006.1714498
Filename :
1714498
Link To Document :
بازگشت