• DocumentCode
    276054
  • Title

    The design of electronic assembly facilities using the DRAMA methodology

  • Author

    Bennett, D.S. ; Forrester, P.L.

  • fYear
    1990
  • fDate
    10-12 Jul 1990
  • Firstpage
    38
  • Lastpage
    43
  • Abstract
    The paper presented by the authors (1988) at the Factory 2000 Conference described the design of a modular assembly cascade system for the assembly of mainframe and minicomputer products within ICL´s Ashton-under-Lyne factory near Manchester, UK. Details were also provided of a related three year Science and Engineering Research Council project, funded under its `ACME´ Directorate. The present paper outlines the findings of the project and describes the basic concepts of the process design methodology which forms the major output from the research. This methodology, called the `design routine for adopting modular assembly´ (DRAMA), provides a set of guiding principles for organizations concerned with high variety electronics production who wish to implement the principles of `cascade pull´ and modularity. The DRAMA methodology is now contained within a manual; the contents and structure of which are also described
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Factory 2001--Integrating Information and Material Flow, 1990., Second International Conference on
  • Conference_Location
    Cambridge
  • Print_ISBN
    0-86341-704-3
  • Type

    conf

  • Filename
    145641