DocumentCode :
276054
Title :
The design of electronic assembly facilities using the DRAMA methodology
Author :
Bennett, D.S. ; Forrester, P.L.
fYear :
1990
fDate :
10-12 Jul 1990
Firstpage :
38
Lastpage :
43
Abstract :
The paper presented by the authors (1988) at the Factory 2000 Conference described the design of a modular assembly cascade system for the assembly of mainframe and minicomputer products within ICL´s Ashton-under-Lyne factory near Manchester, UK. Details were also provided of a related three year Science and Engineering Research Council project, funded under its `ACME´ Directorate. The present paper outlines the findings of the project and describes the basic concepts of the process design methodology which forms the major output from the research. This methodology, called the `design routine for adopting modular assembly´ (DRAMA), provides a set of guiding principles for organizations concerned with high variety electronics production who wish to implement the principles of `cascade pull´ and modularity. The DRAMA methodology is now contained within a manual; the contents and structure of which are also described
fLanguage :
English
Publisher :
iet
Conference_Titel :
Factory 2001--Integrating Information and Material Flow, 1990., Second International Conference on
Conference_Location :
Cambridge
Print_ISBN :
0-86341-704-3
Type :
conf
Filename :
145641
Link To Document :
بازگشت