DocumentCode :
2762117
Title :
An Efficient Method for No-Wait Flow Shop Scheduling to Minimize Makespan
Author :
Li, Xiaoping ; Wang, Qian ; Wu, Cheng
Author_Institution :
Dept. of Comput. Sci. & Eng., Southeast Univ., Nanjing
fYear :
2006
fDate :
3-5 May 2006
Firstpage :
1
Lastpage :
6
Abstract :
In this paper, an objective increment method is introduced for no-wait flow shops with makespan minimization, which can calculate makespan of a new schedule directly from that of its parent and can judge whether the new schedule is better than its parent or not. Specific makespan increments are analyzed for insertion and pair-wise exchange, two fundamental operations in most heuristics for flow shops. Moreover, a composite heuristic based on makespan increment is proposed. Experimental results show that the proposal outperforms the best existing algorithms SA2, RAJ and GR for the problem considered and it needs minimal CPU time among the four compared algorithms, which implies that the proposal is desirable for large-scale no-wait flow shops in practical manufacturing systems
Keywords :
flow shop scheduling; manufacturing systems; minimisation; makespan minimization; manufacturing system; no-wait flow shop scheduling; objective increment method; Collaborative work; Computer science; Design engineering; Design methodology; Dynamic scheduling; Job shop scheduling; Large-scale systems; Manufacturing systems; Processor scheduling; Proposals; Heuristic; Makespan; No-wait Flow Shop; Scheduling;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Computer Supported Cooperative Work in Design, 2006. CSCWD '06. 10th International Conference on
Conference_Location :
Nanjing
Print_ISBN :
1-4244-0164-X
Electronic_ISBN :
1-4244-0165-8
Type :
conf
DOI :
10.1109/CSCWD.2006.253027
Filename :
4019063
Link To Document :
بازگشت