DocumentCode :
276479
Title :
Computerized control on 11 kV distribution network of the Hongkong Electric Co. Ltd
Author :
Wan, W.K.
Author_Institution :
Hongkong Electr. Co. Ltd., Hong Kong
fYear :
1991
fDate :
5-8 Nov 1991
Firstpage :
527
Abstract :
The author examines the development, operational experience, and future prospect of computerised control on the 11 kV distribution network of the Hongkong Electric Co. Ltd. (HEC). Computerized control proves to be successful in saving human efforts in carrying out switching manually at substations. Apart from saving time required for switching, it is also a safer means of switching. It also reduces the supply interruption time to an acceptable level in the event of a 11 kV cable fault and can be seen as an economical alternative to a full ring 11 kV network installed with unit protection
Keywords :
distribution networks; electrical faults; power system computer control; substations; switching; 11 kV; Hongkong Electric Company; cable fault; computerised control; distribution network; substations; supply interruption time; switching;
fLanguage :
English
Publisher :
iet
Conference_Titel :
Advances in Power System Control, Operation and Management, 1991. APSCOM-91., 1991 International Conference on
Conference_Location :
IET
Print_ISBN :
0-86341-246-7
Type :
conf
Filename :
154129
Link To Document :
بازگشت