• DocumentCode
    276480
  • Title

    Interconnected operation of the China Light power system

  • Author

    Mitten, R. ; Lee, Y.B.

  • Author_Institution
    China Light & Power Co. Ltd., Kowloon, Hong Kong
  • fYear
    1991
  • fDate
    5-8 Nov 1991
  • Firstpage
    530
  • Abstract
    In 1978 China Light´s power system had a peak demand of 1572 MW and was isolated from its neighbours on Hong Kong Island and Guangdong Province. In 1991 its internal peak demand is expected to be around 4400 MW and interconnections totalling 1000 MVA capacity exist with Guangdong Province and 720 MVA with Hongkong Electric. The authors detail the establishment of the interconnections, the benefits incurred as well as the operational problems which have had to be solved
  • Keywords
    power system interconnection; China Light & Power Company; Guangdong Province; Hong Kong Island; Hongkong Electric; operational problems; power system interconnection;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Advances in Power System Control, Operation and Management, 1991. APSCOM-91., 1991 International Conference on
  • Conference_Location
    IET
  • Print_ISBN
    0-86341-246-7
  • Type

    conf

  • Filename