• DocumentCode
    277578
  • Title

    Factory 2000-translating the vision into reality

  • Author

    Small, Brian

  • Author_Institution
    Ingersoll Engineers, Rugby, UK
  • fYear
    1992
  • fDate
    27-29 Jul 1992
  • Firstpage
    1
  • Lastpage
    5
  • Abstract
    Survey evidence leads to the conclusion that managing directors have been making great strides towards an understanding of the potential for Factory 2000, but the need-and deserve-greater support in translating their visions into the high-performing manufacturing businesses of the future. This is the challenge for those who are working to build a strategic perspective for the future
  • Keywords
    factory automation; management; technological forecasting; Factory 2000; factory automation; future; high-performing manufacturing businesses; managing directors; strategic perspective; visions;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Factory 2000, 1992. 'Competitive Performance Through Advanced Technology'., Third International Conference on (Conf. Publ. No. 359)
  • Conference_Location
    York
  • Print_ISBN
    0-85296-548-6
  • Type

    conf

  • Filename
    171845