• DocumentCode
    2776275
  • Title

    New Haven line catenary replacement

  • Author

    Savchak, Michael W.

  • Author_Institution
    Metro-North Commuter Railroad, New York, NY, USA
  • fYear
    1990
  • fDate
    17-19 Apr 1990
  • Firstpage
    91
  • Lastpage
    94
  • Abstract
    The replacement of the New Haven catenary system is discussed from the viewpoint of the engineering processes involved in the planning and design of this replacement project. In studying the replacement system, catenary systems worldwide were examined to determine their suitability. One major constraint was the existing support structure spacing of 300 ft. The pantograph study indicated that all existing and proposed pantographs were compatible with the existing system as well as with all of the proposed replacement systems. The railroad is now in the process of seeking bids for the reconstruction effort
  • Keywords
    pantographs; New Haven catenary system; pantograph; Copper; Power system reliability; Rails; Railway electrification; Railway engineering; Roads; Substations; Traction motors; Voltage; Wire;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Railroad Conference, 1990., Technical Papers Presented at the 1990 ASME/IEEE Joint
  • Conference_Location
    Chicago, IL
  • Type

    conf

  • DOI
    10.1109/RRCON.1990.171665
  • Filename
    171665