Abstract :
At the centre of Sizewell B control indication and alarm systems lie the integrated systems for centralised operations (ISCO). The ISCO can be viewed as the brain and central nervous system of the power station. It had always been a great challenge to engineer the ISCO systems to meet the requirements of the station´s target construction programme. Half way through the project a major disruptive event happened and resulted in NE having to change the ISCO contractor. The author describes the process of the change and how the effects of the change were handled
fLanguage :
English
Publisher :
iet
Conference_Titel :
Electrical and Control Aspects of the Sizewell B PWR, 1992., International Conference on
Conference_Location :
London
Print_ISBN :
0-85296-550-8
Type :
conf
Filename :
171994
Link To Document :
بازگشت