    The implementation of a centralised C&I system for Sizewell B power

  • Author

    Story, D.T.

  • fYear
    1992
  • fDate
    14-15 Sep 1992
  • Firstpage
    127
  • Lastpage
    129
  • Abstract
    At the centre of Sizewell B control indication and alarm systems lie the integrated systems for centralised operations (ISCO). The ISCO can be viewed as the brain and central nervous system of the power station. It had always been a great challenge to engineer the ISCO systems to meet the requirements of the station´s target construction programme. Half way through the project a major disruptive event happened and resulted in NE having to change the ISCO contractor. The author describes the process of the change and how the effects of the change were handled
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Electrical and Control Aspects of the Sizewell B PWR, 1992., International Conference on
  • Conference_Location
    London
  • Print_ISBN
    0-85296-550-8
  • Type

    conf

  • Filename
    171994