• DocumentCode
    277714
  • Title

    A cost efficient approach to approval and qualification of equipment [at Sizewell B]

  • Author

    Underwood, R.A.

  • Author_Institution
    NEI Control syst., Gateshead
  • fYear
    1992
  • fDate
    14-15 Sep 1992
  • Firstpage
    189
  • Lastpage
    197
  • Abstract
    All of the safety related control and instrumentation (C&I) equipment for Sizewell B nuclear power station has to be seismically and environmentally qualified to new standards prepared by Nuclear Electric. The components used in this equipment must also, in general, have Nuclear Electric project approval. NEI Control Systems (NEI-CS) have been awarded the process plant C&I Contract for Sizewell B. All the essential equipment supplied under these contracts is subject to full equipment qualification and project approval procedures. The authors outline the detailed procedures adopted by NEI-CS to achieve these project requirements. SDRC provide a consultancy service to assist in the qualification process. Examples of the various stages are provided where appropriate
  • Keywords
    fission reactor instrumentation; fission reactor safety; nuclear power stations; standards; testing; PWR; Sizewell B nuclear power station; UK; contracts; instrumentation; project; qualification testing; safety; standards;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Electrical and Control Aspects of the Sizewell B PWR, 1992., International Conference on
  • Conference_Location
    London
  • Print_ISBN
    0-85296-550-8
  • Type

    conf

  • Filename
    172004