• DocumentCode
    277716
  • Title

    Software safety assessment and the Sizewell B applications

  • Author

    Betts, A.E. ; Welbourne, D.

  • Author_Institution
    NNC Ltd., Knutsford, UK
  • fYear
    1992
  • fDate
    14-15 Sep 1992
  • Firstpage
    204
  • Lastpage
    207
  • Abstract
    The Sizewell B PWR has two diverse protection systems which initiate automatic reactor trip and engineered safety features (ESF) needed for any fault, by detecting if measured plant signals are outside defined limits. Both systems have four redundant channels with two-out-of-four voting for each action. The primary protection system (PPS) is a computer based system and protects the reactor for all design basis faults. The station also has a computer based integrated system for centralised operations (ISCO), which includes self-contained high integrity computer system (HICS) sections. The authors describe the processes of assessment carried out for Nuclear Electric (NE), of the software provided by Westinghouse, as suppliers of the PPS and HICS. NE conducted extensive reviews and analysis of the software, in the course of establishing the safety case
  • Keywords
    fission reactor safety; nuclear power stations; power station computer control; program testing; software reliability; PWR; Sizewell B; UK; engineered safety features; high integrity computer system; integrated system for centralised operations; nuclear power stations; power station computer control; primary protection system; redundant channels; software reliability; two-out-of-four voting;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Electrical and Control Aspects of the Sizewell B PWR, 1992., International Conference on
  • Conference_Location
    London
  • Print_ISBN
    0-85296-550-8
  • Type

    conf

  • Filename
    172006