• DocumentCode
    277720
  • Title

    Integration and factory acceptance testing of the primary protection system [at Sizewell B]

  • Author

    Delava, E. ; Van Tiggelen, P.

  • Author_Institution
    Westinghouse Energy Syst. Int., Brussels, Belgium
  • fYear
    1992
  • fDate
    14-15 Sep 1992
  • Firstpage
    245
  • Lastpage
    251
  • Abstract
    The authors present a program of integration checks and factory acceptance tests which the primary protection system of Sizewell B nuclear power station underwent during the various manufacturing phases. They show how built in diagnostic tools were used to integrate the system into a functional unit. They then cover the system factory acceptance tests including heat rise and RFI testing. They outline the factory acceptance test objectives, methods, acceptance criteria, tools and results
  • Keywords
    fission reactor safety; nuclear power stations; quality control; radiofrequency interference; testing; thermal analysis; PWR; RFI; Sizewell B nuclear power station; UK; diagnostic tools; factory acceptance tests; heat rise; integration checks; manufacturing; primary protection system; safety;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Electrical and Control Aspects of the Sizewell B PWR, 1992., International Conference on
  • Conference_Location
    London
  • Print_ISBN
    0-85296-550-8
  • Type

    conf

  • Filename
    172011