Title :
Instrumentation for the automatic testing of three-phase induction motors
Author :
Lewis, M. ; Redlaff, A.
Author_Institution :
Polytech. Huddersfield, UK
Abstract :
The authors describe the automatic test facility for three-phase induction motors at Brook Crompton, Large Industrial Motors, Guiseley. The facility is for frame sizes 180, 200 and 225, either foot or flange mounted. The test specifications are listed and the data acquisition for line voltages, current, speed, torque and no-load values discussed. Data output is briefly discussed
Keywords :
automatic test equipment; data acquisition; induction motors; machine testing; test facilities; Brook Crompton; automatic test facility; current; data acquisition; data output; flange mounted; foot mounted; line voltages; no-load values; speed; test specifications; three-phase induction motors; torque;
Conference_Titel :
Instrumentation of Rotating Electrical Machines, IEE Colloquium on
Conference_Location :
London