Title :
Evolution of generation in parallel with the network
Author :
Evans, P.W. ; Hadfield, D.W. ; Kasher, R.
Author_Institution :
Cerestar UK Ltd., Manchester, UK
Abstract :
The authors discuss the energy requirements of Cerestar, the leading European producer of starches and derivatives. The authors describe the system used to generate the necessary steam and electrical power. In particular they discuss the use of turboalternators and their control, voltage selection and distribution configuration, and parallel operation with the local network
Keywords :
alternators; cogeneration; distribution networks; turbogenerators; Cerestar; control; distribution configuration; electric power generation; energy requirements; parallel operation; starch producer; steam generation; turboalternators; voltage selection;
Conference_Titel :
Parallel Operation of Generating Plant within a Public Electricity Supply Network, IEE Colloquium on
Conference_Location :
Chester