DocumentCode :
278167
Title :
Oldbury boiler control system
Author :
March, A.R. ; Williams, T.B.
Author_Institution :
Div. of Oper. Eng., CEGB, Bristol, UK
fYear :
1991
fDate :
33308
Firstpage :
42430
Lastpage :
42434
Abstract :
The authors describe the replacement of the main boiler controls at Oldbury-on-Severn Nuclear Power Station. The original station equipment was replaced with modern digital equipment based on programmable logic controllers (PLCs). The authors describe the old system and the need for its replacement, and the principles of the new system. They then describe the design features of the new control system and discuss its implementation
Keywords :
digital control; fission reactor cooling and heat recovery; nuclear reactor steam generators; programmable controllers; MAGNOX; Oldbury-on-Severn Nuclear Power Station; boiler control system; digital equipment; programmable logic controllers;
fLanguage :
English
Publisher :
iet
Conference_Titel :
Retrofit and Upgrading of Computer Equipment in Nuclear Power Stations, IEE Colloquium on
Conference_Location :
London
Type :
conf
Filename :
181308
Link To Document :
بازگشت