DocumentCode
2785104
Title
Reducing cost and ensuring on-time delivery of mcm massively parallel computing modules
Author
Habiger, Claus ; Lea, Mike
Author_Institution
Aspex Microsystems Ltd.
fYear
1994
fDate
1994
Keywords
Assembly; Costs; Delay; Employment; Hazards; Manufacturing; Parallel processing; Power engineering computing; Production; Uncertainty;
fLanguage
English
Publisher
ieee
Conference_Titel
MCM and VLSI Packaging Techniques and Manufacturing Technologies, 1994. Workshop on
Type
conf
DOI
10.1109/WPTMT.1994.763517
Filename
763517
Link To Document