• DocumentCode
    2788639
  • Title

    Research on bus rapid transit (BRT) and its real-time scheduling

  • Author

    Dong, Xisong ; Xiong, Gang ; Fan, Dong ; Zhu, Fenghua ; Lv, Yisheng

  • Author_Institution
    State Key Lab. of Intell. Control & Manage. of Complex Syst., Chinese Acad. of Sci., Beijing, China
  • fYear
    2011
  • fDate
    10-12 July 2011
  • Firstpage
    342
  • Lastpage
    346
  • Abstract
    With the fast development of the economy, the urban traffic demands increases rapidly, Bus rapid transit (BRT) system, a new type and high efficient bus operator system and a comprehensive mass transit system between the metro and regular bus systems, can alleviate traffic congestion, reduce resident traffic cost effectively, and improve transportation quality and efficiency, with its advantages becomes an effective way to improve urban traffic status. In this article, the definition, major elements, advantages, functions and development of BRT are provided, and a new real-time scheduling is given which is going to be applied to the Zhongshan Avenue BRT system in Guangzhou China.
  • Keywords
    rapid transit systems; road traffic; road vehicles; scheduling; BRT system; bus operator system; bus rapid transit system; mass transit system; real-time scheduling; resident traffic cost; traffic congestion; transportation efficiency; transportation quality; urban traffic; Compounds; Global Positioning System; Optimization; Rails; bus dispatch; bus rapid transit (BRT); public transport systems; scheduling scheme;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Service Operations, Logistics, and Informatics (SOLI), 2011 IEEE International Conference on
  • Conference_Location
    Beijing
  • Print_ISBN
    978-1-4577-0573-1
  • Type

    conf

  • DOI
    10.1109/SOLI.2011.5986582
  • Filename
    5986582