    Modeling Time-Cost Trade-Off Problem with Fuzzy Activity Duration Times

  • Author

    Ma, Weimin ; Ke, Hua

  • Author_Institution
    Sch. of Econ. & Manage., Tongji Univ., Shanghai, China
  • fYear
    2009
  • fDate
    21-23 Nov. 2009
  • Firstpage
    344
  • Lastpage
    347
  • Abstract
    The time-cost trade-off problem is a type of the project scheduling problem which studies how to modify project activities so as to achieve the trade-off between the project cost and the completion time. In real projects, the trade-off between project cost and project completion time, and the uncertainty of the environment are both considerable aspects for decision-makers. In this paper, an expected value model for the fuzzy time-cost trade-off problem is proposed, in which credibility theory is applied to describe the uncertainty of activity duration times. A searching method as a hybrid intelligent algorithm integrating fuzzy simulation and genetic algorithm is produced to search the optimal schedules.
  • Keywords
    decision making; fuzzy set theory; genetic algorithms; project management; scheduling; decision-makers; fuzzy activity duration times; fuzzy time-cost trade-off problem; genetic algorithm; hybrid intelligent algorithm; project completion time; project scheduling problem; Conference management; Costs; Environmental economics; Genetic algorithms; Optimal scheduling; Project management; Resource management; Stochastic processes; Technology management; Uncertainty;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Cooperation and Promotion of Information Resources in Science and Technology, 2009. COINFO '09. Fourth International Conference on
  • Conference_Location
    Beijing
  • Print_ISBN
    978-0-7695-3898-3
  • Type

    conf

  • DOI
    10.1109/COINFO.2009.44
  • Filename
    5361913