• DocumentCode
    2793546
  • Title

    Notice of Retraction
    The calculation of uphill belt conveyer catcher

  • Author

    Juan, Zhao

  • Author_Institution
    Autom. Dept., Binzhou Univ. Binzhou, Binzhou, China
  • fYear
    2011
  • fDate
    15-17 July 2011
  • Firstpage
    766
  • Lastpage
    769
  • Abstract
    Notice of Retraction

    After careful and considered review of the content of this paper by a duly constituted expert committee, this paper has been found to be in violation of IEEE´s Publication Principles.

    We hereby retract the content of this paper. Reasonable effort should be made to remove all past references to this paper.

    The presenting author of this paper has the option to appeal this decision by contacting TPII@ieee.org.

    According to the working characteristics and the requests of uphill belt conveyer, this article introduced on uphill belt conveyer catcher the computational method, the detailed inferential reasoning mediated the belt catcher the best operating time formula, most greatly installs the spacing formula as well as the conveyer entire factory needs the catcher quantity and the stop time formula, and finally drew the conclusion.
  • Keywords
    belts; conveyors; operating time formula; spacing formula; uphill belt conveyer catcher; Accidents; Belts; Coal; Equations; Mathematical model; Vibrations; belt conveyer; belt-breaking; catcher;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Mechanic Automation and Control Engineering (MACE), 2011 Second International Conference on
  • Conference_Location
    Hohhot
  • Print_ISBN
    978-1-4244-9436-1
  • Type

    conf

  • DOI
    10.1109/MACE.2011.5987040
  • Filename
    5987040