DocumentCode
2799177
Title
Application research on construction technology of spin dig cast-in-place pile based on the spin dry homework
Author
Yin, Zhenyu ; Liu, Dongxia
Author_Institution
Dept. of Traffic Eng., Henan Univ. of Urban Constr., Pingdingshan, China
fYear
2011
fDate
15-17 July 2011
Firstpage
1989
Lastpage
1991
Abstract
It is applicable to use spin dig cast-in-place concrete piles based on the spin dry homework in soil with good soil orthostatic and no groundwater in the hole. Holes can be finished without slurry-supported measures. It is formed directly with wide application. The construction of pile foundation in LSTJNO.3 of LuoYang to LuanChuan freeway was researched and analyzed in this article. Through the technology research and the common problem analysis, the corresponding methods and treatment measures were putted forward.
Keywords
concrete; foundations; road building; slurries; soil; LSTJNO.3; LuoYang to LuanChuan freeway; construction technology; pile foundation construction; slurry supported measure; soil orthostatic; spin dig cast-in-place concrete piles; spin dry homework; Bridges; Concrete; Orifices; Plastics; Presses; Soil; Soil measurements; Bored pile; Dry homework; Helical drilling;
fLanguage
English
Publisher
ieee
Conference_Titel
Mechanic Automation and Control Engineering (MACE), 2011 Second International Conference on
Conference_Location
Hohhot
Print_ISBN
978-1-4244-9436-1
Type
conf
DOI
10.1109/MACE.2011.5987360
Filename
5987360
Link To Document