DocumentCode :
280412
Title :
The advantages of knowledge based techniques in pump scheduling
Author :
Likeman, M.
Author_Institution :
Dept. of Comput. Sci., Reading Univ., UK
fYear :
1990
fDate :
33168
Firstpage :
42461
Lastpage :
42463
Abstract :
Describes a knowledge based technique for pump scheduling that has been developed at BHR Group, and discusses its advantages over more traditional methods of pump scheduling based on operations research
Keywords :
knowledge based systems; scheduling; water supply; BHR Group; knowledge based systems; operations research; pump scheduling; water distribution networks; water supply;
fLanguage :
English
Publisher :
iet
Conference_Titel :
Control and Optimisation Techniques for the Water Industry: II, IEE Colloquium on
Conference_Location :
London
Type :
conf
Filename :
190679
Link To Document :
بازگشت