DocumentCode
2804209
Title
The integrated process of project risk management based on influence diagrams
Author
Liu, Y.Q. ; Shen, Y.P. ; Chen, Y.W. ; Gao, E.
Author_Institution
Inf. Eng. & Manage. Sch., Nat. Univ. of Defense Technol., Changsha, China
Volume
2
fYear
2004
fDate
18-21 Oct. 2004
Firstpage
746
Abstract
We show how to apply influence diagrams theory to the whole process of the project risk management, which including risk identification, risk assessment, risk control and risk documentation. First, we propose a frame to construct a graphical risk influence diagram and two ways to construct the functional and numerical risk influence diagram efficiently. Next, we summarize two ways to calculate the risk probability and the project expectation value. Thirdly, we argue to utilize the value of perfect control and value of perfect information to control the project risk. Last, the project risk influence diagram is used as a framework to document the project risk.
Keywords
project management; risk management; functional risk; graphical risk influence diagram; influence diagrams theory; numerical risk influence diagram; project expectation value; project risk management; risk assessment; risk control; risk documentation; risk identification; risk probability; value of perfect control; value of perfect information; Documentation; Engineering management; Identity management systems; Information management; Neural networks; Probability; Risk analysis; Risk management; Technology management; Uncertainty;
fLanguage
English
Publisher
ieee
Conference_Titel
Engineering Management Conference, 2004. Proceedings. 2004 IEEE International
Print_ISBN
0-7803-8519-5
Type
conf
DOI
10.1109/IEMC.2004.1407479
Filename
1407479
Link To Document