• DocumentCode
    280605
  • Title

    Installation of electrical equipment for flue gas desulphurisation retrofit at Drax power station

  • Author

    Whittle, R.

  • fYear
    1990
  • fDate
    32892
  • Firstpage
    42430
  • Lastpage
    42432
  • Abstract
    Installation of flue gas desulphurisation plant at existing power stations inevitably clashes with existing services, which requires their relocation and diversion. The Drax FGD installation has highlighted the extent of this. The author discusses the diversion and location of electrical equipment caused by the retrofit at Drax. The diversions include a 400 kV overhead line, a cable tunnel, and fuel oil and propane systems. The location of the electrical supplies, switchgear and auxiliary transformers are also discussed
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Electrical Aspects of Desulphurisation, IEE Colloquium on
  • Conference_Location
    London
  • Type

    conf

  • Filename
    190951