Research on the caisson sinking method of north anchorage of Taizhou Changjiang River highway bridge
Author
Wang, Yuehua ; Zhang, Mingshan ; Ding, Hanfei
Author_Institution
Taizhou Polytech. Coll., Taizhou, China
fYear
2011
fDate
15-17 July 2011
Firstpage
3376
Lastpage
3379
Abstract
The north anchorage of Taizhou Changjiang River highway bridge is made by a large open caisson, length of the caisson is 67.9m, the width is 52.0m, and the height is 57m. The caisson divided into 11 segments in total, the first segment is 8m long, made by steel covered concrete, the 10th segment is 4m long, and the other are 5m, all made by reinforced concrete. By Surveying , Choosing by the fact that the first step compares, Researching by construction risk and construction work efficiency and Calculating comparison, the caisson sinking method was chosen finally to be partial drainage method, and the choose detail was introduced in this paper. The chosen caisson sinking method was proved to be feasible in practice, and the experience could be useful for the other similar engineering.
Keywords
bridges (structures); geotechnical engineering; reinforced concrete; risk analysis; structural engineering; Taizhou Changjiang river highway bridge; anchorage; caisson sinking method; construction risk; construction work efficiency; partial drainage method; reinforced concrete; steel; Bridges; Concrete; Manuals; Presses; Rivers; Road transportation; Caisson Foundation; North Anchorag; Sinking Method; Taizhou Changjiang River Highway Bridge;
fLanguage
English
Publisher
ieee
Conference_Titel
Mechanic Automation and Control Engineering (MACE), 2011 Second International Conference on
Conference_Location
Hohhot
Print_ISBN
978-1-4244-9436-1
Type
conf
DOI
10.1109/MACE.2011.5987715
Filename
5987715
Link To Document