DocumentCode :
280703
Title :
Preparation of power supply
Author :
Wetherell, I.J.
Author_Institution :
British Rail, Croydon, UK
fYear :
1990
fDate :
32958
Firstpage :
42491
Lastpage :
42495
Abstract :
The new Class 465 Networker units will operate in trains of up to 12-cars in length and will have a peak current of 8.1 kA. This increase in loading will in part be compensated for by regenerative braking and greater use of coasting, but the system will have to provide higher currents. The author looks at the preparation of power supplies for the locomotives
Keywords :
electric locomotives; power supplies to apparatus; 8.1 kA; Class 465 Networker units; coasting; locomotives; power supplies; regenerative braking;
fLanguage :
English
Publisher :
iet
Conference_Titel :
Developments for Networker One With Three Phase Drives, IEE Colloquium on
Conference_Location :
London
Type :
conf
Filename :
191091
Link To Document :
بازگشت