• DocumentCode
    280884
  • Title

    Turbo generator plant: the developing role of the original equipment manufacturer

  • Author

    Shelley, I.

  • Author_Institution
    GEC Alsthom Turbine Generators, Stafford, UK
  • fYear
    1990
  • fDate
    33205
  • Firstpage
    42491
  • Lastpage
    42492
  • Abstract
    To power station operators the achievement of reliability and availability of the power generating plant is of primary concern. To this end the original equipment manufacturer (OEM) must assume greater responsibility for the operation of his plant in the field. The OEM should agree and implement with the operator a long term strategic plan for inspection and maintenance of generators, coupled with the introduction, wherever possible, of improved modern day designs and materials to older machines
  • Keywords
    inspection; maintenance engineering; power stations; reliability; synchronous generators; turbogenerators; OEM; availability; inspection; maintenance; original equipment manufacturer; power station operators; reliability; turbogenerators;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Maintenance Practices for Power Generation, IEE Colloquium on
  • Conference_Location
    London
  • Type

    conf

  • Filename
    191342