DocumentCode
2812370
Title
Forecasting technology insertion concurrent with design refresh planning for COTS-based electronic systems
Author
Singh, Pameet ; Sandborn, Peter
Author_Institution
Dept. of Mech. Eng., Maryland Univ., College Park, MD, USA
fYear
2005
fDate
Jan. 24-27, 2005
Firstpage
349
Lastpage
354
Keywords
Monte Carlo methods; belief networks; decision making; design engineering; electronic products; life cycle costing; planning; Bayesian belief network; Monte Carlo method; candidate refresh dates; critical decision making; design refresh planning; design refresh schedule; electronic system; forecasting technology; hybrid analysis scheme; insertion concurrent; life cycle cost; mitigation; network fragment; obsolescence cost analysis; optimum design refresh content; Bayesian methods; Cost function; Decision making; Electronic equipment manufacture; Engines; Job shop scheduling; Technology forecasting; Technology management; Technology planning; Uncertainty;
fLanguage
English
Publisher
ieee
Conference_Titel
Reliability and Maintainability Symposium, 2005. Proceedings. Annual
ISSN
0149-144X
Print_ISBN
0-7803-8824-0
Type
conf
DOI
10.1109/RAMS.2005.1408387
Filename
1408387
Link To Document