• DocumentCode
    2812370
  • Title

    Forecasting technology insertion concurrent with design refresh planning for COTS-based electronic systems

  • Author

    Singh, Pameet ; Sandborn, Peter

  • Author_Institution
    Dept. of Mech. Eng., Maryland Univ., College Park, MD, USA
  • fYear
    2005
  • fDate
    Jan. 24-27, 2005
  • Firstpage
    349
  • Lastpage
    354
  • Keywords
    Monte Carlo methods; belief networks; decision making; design engineering; electronic products; life cycle costing; planning; Bayesian belief network; Monte Carlo method; candidate refresh dates; critical decision making; design refresh planning; design refresh schedule; electronic system; forecasting technology; hybrid analysis scheme; insertion concurrent; life cycle cost; mitigation; network fragment; obsolescence cost analysis; optimum design refresh content; Bayesian methods; Cost function; Decision making; Electronic equipment manufacture; Engines; Job shop scheduling; Technology forecasting; Technology management; Technology planning; Uncertainty;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Reliability and Maintainability Symposium, 2005. Proceedings. Annual
  • ISSN
    0149-144X
  • Print_ISBN
    0-7803-8824-0
  • Type

    conf

  • DOI
    10.1109/RAMS.2005.1408387
  • Filename
    1408387