• DocumentCode
    281865
  • Title

    Cost-effective mechanical design associated with low quantity production

  • Author

    Hedley, A.P.

  • fYear
    1989
  • fDate
    32622
  • Firstpage
    42583
  • Lastpage
    42591
  • Abstract
    On low quantity production, constraints are based around development monies and because the designer is prevented from adopting the feasibility study, prototype, production route of a development program the ultimate design will be right rather than optimum. the control of the costs of the system rest with close liaison between the engineers with a mutual understanding of each others problems and a commitment to the projects success, rather than the success of any particular aspect to the detriment of others. In the particular example used, the mechanical design of the frame was based upon the understanding that the dish weight and pannier weight was not frozen so the author assumed a heavier weight than was forecast so that the design would be finalised within the project programme with no extra costs. This approach was adopted throughout the project
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Mechanical Aspects of Antenna Design, IEE Colloquium on
  • Conference_Location
    London
  • Type

    conf

  • Filename
    198329