• DocumentCode
    282734
  • Title

    Live working on overhead medium voltage networks. Combination of three different methods. Concept of `protection element´

  • Author

    Atlani, C.

  • Author_Institution
    Electricite de France, Paris, France
  • fYear
    1989
  • fDate
    8-12 May 1989
  • Firstpage
    263
  • Abstract
    Since 1969, EDF has developed medium voltage (MV) live working procedures by the `distance´ method in all its overhead networks to improve customer service continuity as well as the working conditions and operating safety of its employees. Simultaneous with this generalization, and with the same aim, experiments have been conducted to introduce the `contact´ and `potential´ working methods. These experiments have led the author to set common rules for the three `distance´, `contact´ and `potential´ methods, to forestall electrical risks and to facilitate the combination of the three methods. The combination of these three working methods is operational today and now being introduced
  • Keywords
    maintenance engineering; personnel; power overhead lines; safety; EDF; France; electrical risks; live working; maintenance engineering; overhead medium voltage networks; personnel; safety;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Electricity Distribution, 1989. CIRED 1989. 10th International Conference on
  • Conference_Location
    Brighton
  • Print_ISBN
    0-85296-376-9
  • Type

    conf

  • Filename
    206080