DocumentCode
282743
Title
Concept of the new control organization for Enher´s medium voltage supply system
Author
Badia, V. ; Rovi, J.M.
Author_Institution
Empresa Nacional Hidroelectrica del Ribagorzana, Barcelona, Spain
fYear
1989
fDate
8-12 May 1989
Firstpage
307
Abstract
The basic lines are described for realizing the operation of the medium voltage network at Enher using Distribution Control Dispatching (DCD), centralized in Barcelona. The network is controlled by using an integral remote control system
Keywords
distribution networks; load dispatching; power system computer control; telecontrol; Distribution Control Dispatching; Enher medium voltage supply system; control organization; integral remote control system;
fLanguage
English
Publisher
iet
Conference_Titel
Electricity Distribution, 1989. CIRED 1989. 10th International Conference on
Conference_Location
Brighton
Print_ISBN
0-85296-376-9
Type
conf
Filename
206089
Link To Document