DocumentCode
2829511
Title
Direct feeding of wet sticky raw materials to large roller mills
Author
O´Neill, Frank
Author_Institution
Blue Circle Cement, Marietta, GA, USA
fYear
1999
fDate
1999
Firstpage
259
Lastpage
268
Abstract
Direct feeding of cement mills with wet sticky materials has long been difficult because of the risk of blockage in the feed system and the resulting shut down of the mill and upset to the process. In-leak of cold air has also been a consideration which has led to the more common practice of pre-drying materials before grinding. This paper shows how direct feeding has been carried out successfully on a new installation
Keywords
cement industry; grinding; process control; cement mills; direct feeding process; grinding; materials pre-drying; wet sticky materials; Ball milling; Building materials; Feeds; Iron; Milling machines; Moisture; Production; Raw materials;
fLanguage
English
Publisher
ieee
Conference_Titel
Cement Industry Technical Conference, 1999. Conference Record. 1999 IEEE-IAS/PCA
Conference_Location
Roanoke, VA
ISSN
1079-9931
Print_ISBN
0-7803-5523-7
Type
conf
DOI
10.1109/CITCON.1999.767041
Filename
767041
Link To Document