DocumentCode :
2829511
Title :
Direct feeding of wet sticky raw materials to large roller mills
Author :
O´Neill, Frank
Author_Institution :
Blue Circle Cement, Marietta, GA, USA
fYear :
1999
fDate :
1999
Firstpage :
259
Lastpage :
268
Abstract :
Direct feeding of cement mills with wet sticky materials has long been difficult because of the risk of blockage in the feed system and the resulting shut down of the mill and upset to the process. In-leak of cold air has also been a consideration which has led to the more common practice of pre-drying materials before grinding. This paper shows how direct feeding has been carried out successfully on a new installation
Keywords :
cement industry; grinding; process control; cement mills; direct feeding process; grinding; materials pre-drying; wet sticky materials; Ball milling; Building materials; Feeds; Iron; Milling machines; Moisture; Production; Raw materials;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Cement Industry Technical Conference, 1999. Conference Record. 1999 IEEE-IAS/PCA
Conference_Location :
Roanoke, VA
ISSN :
1079-9931
Print_ISBN :
0-7803-5523-7
Type :
conf
DOI :
10.1109/CITCON.1999.767041
Filename :
767041
Link To Document :
بازگشت