DocumentCode
2829536
Title
Cape Girardeau´s low cost 100000 ton clinker expansion
Author
Burian, John E. ; Zolotsky, Scott J.
Author_Institution
Lone Star Ind. Inc., USA
fYear
1999
fDate
1999
Firstpage
279
Lastpage
295
Abstract
Lone Star Industries, Inc. (LSI) operates a cement plant at Cape Girardeau, Missouri, USA. The Fuller Company was requested to study the operation of the plant´s raw grinding and pyro-processing systems and evaluate if an increase in the nominal clinker production could be achieved. The impetus for the evaluation was Lone Star´s desire to meet the future cement sales demand for the Mississippi Valley market, The evaluation team involved Fuller process and mechanical specialists who visited the site and surveyed the existing plant operations to determine the limitations of the process machinery, recommend operational changes and develop a report with their findings. All recommendations had to emphasize re-using as much of the existing equipment as possible in order to arrive at an economically justifiable solution, in terms of both capital investment and the shortest possible downtime
Keywords
cement industry; maintenance engineering; process control; project engineering; USA; capital investment; cement plant; downtime minimisation; expansion projects; nominal clinker production; process machinery; pyro-processing systems; raw grinding systems; Cement industry; Contracts; Costs; Large scale integration; Machinery; Marketing and sales; Milling machines; Principal component analysis; Production systems; Vents;
fLanguage
English
Publisher
ieee
Conference_Titel
Cement Industry Technical Conference, 1999. Conference Record. 1999 IEEE-IAS/PCA
Conference_Location
Roanoke, VA
ISSN
1079-9931
Print_ISBN
0-7803-5523-7
Type
conf
DOI
10.1109/CITCON.1999.767043
Filename
767043
Link To Document