• DocumentCode
    283114
  • Title

    The connection of one large power station to the main grid

  • Author

    Invernizzi, A.

  • fYear
    1988
  • fDate
    32223
  • Abstract
    The authors compare the methods used by EDF, ENEL and CEGB for the connection of one large power station to the main system. Two major issues are discussed: the principles of planning and site selection, and the connection of the new station to the main grid. For each utility the authors discuss the procedures used for siting, grid connection which includes power export considerations and security of supply to the auxiliaries. An example is given for each utility
  • Keywords
    power stations; power systems; CEGB; EDF; ENEL; main grid; planning; power export considerations; power station; site selection; supply security;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    CEGB/EDF/ENEL Collaboration on Power System Planning and Operation, IEE Colloquium on
  • Conference_Location
    London
  • Type

    conf

  • Filename
    208970