DocumentCode :
2831956
Title :
Resource-Constrained Multi-project Management with Activity Weights in Software Engineering
Author :
Chen, Leping ; Li, Kewen
Author_Institution :
Sch. of Opto-Electron. Inf. Sience & Technol., YanTai Univ., Yantai, China
fYear :
2009
fDate :
11-12 July 2009
Firstpage :
458
Lastpage :
461
Abstract :
Resource-constrained multi-project management is of vital importance in software engineering as it has more uncertainties must be considered. Based on the detailed analyses to popular and significant approaches, such as CPM, PERT, CCPM, and the dynamic characteristics of software multi-project management, this paper argues a dynamic model with project and activity weights to solve the scheduling problem on resource-constrained multi-project, and analyzes an example in detail. The method can also be suitable for similar complicated project management in other domains.
Keywords :
scheduling; software engineering; activity weights; resource-constrained multiproject management; scheduling; software engineering; Automatic control; Communication system control; Conference management; Constraint theory; Dynamic scheduling; Engineering management; Project management; Resource management; Software engineering; Technology management; activity weights; project management; resource constrained; software engineering;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Control, Automation and Systems Engineering, 2009. CASE 2009. IITA International Conference on
Conference_Location :
Zhangjiajie
Print_ISBN :
978-0-7695-3728-3
Type :
conf
DOI :
10.1109/CASE.2009.84
Filename :
5194491
Link To Document :
بازگشت