Scheduling of BOF Producing Molten Steel for CSP and PM
Author
Lu Husheng ; Cao Jianzhong
Author_Institution
Sch. of Econ. & Manage., Inner Mongolia Univ. of Sci. & Technol., IMUST, Baotou, China
fYear
2009
fDate
11-13 Dec. 2009
Firstpage
1
Lastpage
3
Abstract
This paper established a scheduling model using disjunctive graph and it was implemented in B works, where two casting machines were sharing the molten steel of two converters. The graph represented and satisfied constraints of buffer capacity and maximum residence time from hot metal´s refining to casting. By means of heuristic algorithm based on maximum consecutive heats without outsourcing and minimum consecutive heats between two adjacent acceptance of outsourcing, the paper also demonstrated that exchanging sub-sequence of task at proper switching point could attain optimized schedule.
Keywords
casting; constraint theory; graph theory; scheduling; B works; BOF producing molten steel scheduling; buffer capacity; casting machine; disjunctive graph; heuristic algorithm; maximum consecutive heat; maximum residence time; satisfied constraint; Casting; Furnaces; Heuristic algorithms; Outsourcing; Processor scheduling; Production systems; Scheduling algorithm; Slabs; Steel; Technology management;
fLanguage
English
Publisher
ieee
Conference_Titel
Computational Intelligence and Software Engineering, 2009. CiSE 2009. International Conference on
Conference_Location
Wuhan
Print_ISBN
978-1-4244-4507-3
Electronic_ISBN
978-1-4244-4507-3
Type
conf
DOI
10.1109/CISE.2009.5364345
Filename
5364345
Link To Document