DocumentCode :
283706
Title :
Network 21C-an update [overhead system protection]
Author :
Craddock, P.
fYear :
1988
fDate :
1988
Firstpage :
42705
Lastpage :
42710
Abstract :
Three distinct stages of overhead power system operation have evolved in East Midland Electricity. Experience has shown that the majority of faults affecting the overhead system were transient, nondamage, and that the best performance, in terms of the lowest `customer-hours lost´ was achieved with minimum numbers of strategically positioned fuses, coupled with automatic reclosing 11 kV switches. This replaced the initial, heavily fused, system design. The third, and current, stage is still that of a minimum `fused´ system but with optimum use of source and pole mounted automatic reclosers, new electronic sectionalisers (which can replace fuses), fault passage indicators and automatic pole mounted isolators
fLanguage :
English
Publisher :
iet
Conference_Titel :
Improving Supply Security on 11kV Overhead Networks, IEE Colloquium on
Conference_Location :
London
Type :
conf
Filename :
209783
Link To Document :
بازگشت