• DocumentCode
    2837495
  • Title

    The salvage of the litton launching platform

  • Author

    Bartholomew, C.A.

  • fYear
    1975
  • fDate
    22-25 Sept. 1975
  • Firstpage
    583
  • Lastpage
    591
  • Abstract
    The sinking of the Litton launching platform while undocking the USS SPRUANCE (DD 963) jeopardized the lngalls Division´s entire shipbuilding program. Under the direction of the U.S. Navy Supervisor of Salvage, an intensive salvage operation was successfully conducted to raise the platform as expediently as possible for subsequent restoration and return to use. The structural limitations of the dock and hydrostatics of the situation presented the salvors with a unique and formidable challenge which was ultimately to be overcome by an innovative salvage technique employing simultaneous pumping and blowing with air.
  • Keywords
    naval engineering; shipbuilding industry; Litton launching platform; U.S. Navy Supervisor of Salvage; USS SPRUANCE (DD 963); dock; hydrostatics; lngalls Division; salvage operation; shipbuilding program; structural limitation; Assembly; Buildings; Construction industry; Cranes; Marine vehicles; Rails; Shipbuilding industry; Sonar; Structural beams; Welding;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    OCEAN 75 Conference
  • Conference_Location
    San Diego, CA
  • Type

    conf

  • DOI
    10.1109/OCEANS.1975.1154074
  • Filename
    1154074