DocumentCode
2837595
Title
Research on integrated scheduling of refinery hydrogen network with hydrogen inventory
Author
Xiao-chuan, Luo ; Tao, Ren ; Yan, Liu
Author_Institution
Key Lab. of Process Ind. Autom. (MOE), Northeastern Univ., Shen Yang, China
fYear
2009
fDate
17-19 June 2009
Firstpage
2599
Lastpage
2604
Abstract
Hydrogen network is the key part in crude oil refinery process, which has such features as large scale, complex process. It is very difficult to formalize and optimize the network. This paper presents bi-objective model for the scheduling problem of the hydrogen network. NSGA-II algorithm, which is adopted to solve our model, gives out the Pareto set. Then C2R method can be used to evaluate the Pareto solution in the set. Computational experiments based on the data from certain refinery factory demonstrate the effectiveness and feasibility of the scheduling mothodelogy.
Keywords
Pareto optimisation; crude oil; hydrogen production; inventory management; oil refining; scheduling; C2R method; NSGA-II algorithm; Pareto set; bi-objective model; crude oil refinery process; hydrogen inventory; integrated scheduling; refinery hydrogen network; Automation; Electronic mail; Fuel processing industries; Hydrogen; Job shop scheduling; Laboratories; Oil refineries; Petroleum industry; Processor scheduling; Refining; C2R model; Hydrogen Network; Multiobjective; NSGA-II; Scheduling;
fLanguage
English
Publisher
ieee
Conference_Titel
Control and Decision Conference, 2009. CCDC '09. Chinese
Conference_Location
Guilin
Print_ISBN
978-1-4244-2722-2
Electronic_ISBN
978-1-4244-2723-9
Type
conf
DOI
10.1109/CCDC.2009.5194852
Filename
5194852
Link To Document