• DocumentCode
    2837753
  • Title

    Validation of C-DOT DSS family of switching systems

  • Author

    Hariharan, R. ; Matange, N.

  • fYear
    1989
  • fDate
    22-24 Nov 1989
  • Firstpage
    714
  • Lastpage
    717
  • Abstract
    Carrying out validation plans successfully is one of the key factors in developing a family of switching systems for a developing country. A discussion is presented of the various requirements that a good validation plan should meet. The work draws heavily on the authors´ experiences in this area. The authors provide practical considerations and tips on how to make a good validation plan and conduct the validation exercise more fruitfully. Wherever possible, the authors articulate some interesting conflicts that typically arise in forming and carrying out validation plans. Tools and techniques that are required for validation are also discussed
  • Keywords
    electronic switching systems; project engineering; quality control; software reliability; C-DOT DSS family; digital switching system; validation plan; validation tools; Decision support systems; Product development; Software design; Switches; Switching systems; Telecommunications; Telematics; Testing; Time factors; US Department of Transportation;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    TENCON '89. Fourth IEEE Region 10 International Conference
  • Conference_Location
    Bombay
  • Type

    conf

  • DOI
    10.1109/TENCON.1989.177040
  • Filename
    177040