• DocumentCode
    2841931
  • Title

    Dynamic programming for single batching machine with total weighted completion time

  • Author

    Feng, Daguang ; Liu, Peng ; Wu, Suwen ; Liu, Bo

  • Author_Institution
    Sci. of Inst., Shenyang Agric. Univ., Shenyang, China
  • fYear
    2010
  • fDate
    26-28 May 2010
  • Firstpage
    3798
  • Lastpage
    3799
  • Abstract
    The problem of total weighted completion time for single batching machine is an open problem until now. Accordingly, heuristics is very useful to the problem. We construct a nonlinear mathematical model for the problem with unbounded batching machine. A dynamic programming is also carried for the problem, which is proved to be at most 2 times of the optimal solution later. With an example, we show that the bound is tight.
  • Keywords
    dynamic programming; single machine scheduling; dynamic programming; nonlinear mathematical model; single batching machine; total weighted completion time; unbounded batching machine; Annealing; Coils; Dynamic programming; Furnaces; Integrated circuit manufacture; Manufacturing industries; Mathematical model; Metals industry; Steel; Technology management; batching machine; dynamic programming; worst case;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Control and Decision Conference (CCDC), 2010 Chinese
  • Conference_Location
    Xuzhou
  • Print_ISBN
    978-1-4244-5181-4
  • Electronic_ISBN
    978-1-4244-5182-1
  • Type

    conf

  • DOI
    10.1109/CCDC.2010.5498479
  • Filename
    5498479