DocumentCode
2842028
Title
From feasibility study to construction: A dredged material wildlife reserve in San Diego Bay, California
Author
Firle, T. ; Smith, David D.
Author_Institution
San Diego Unified Port District, San Diego, CA, USA
fYear
1977
fDate
17-19 Oct. 1977
Firstpage
702
Lastpage
711
Abstract
The feasibility of using dredged material to construct an island-like wildlife reserve in southern San Diego Bay was reported in Oceans ´75 (Smith et al., 1975). Subsequent work by the San Diego Unified Port District and consultants on preliminary design studies, cost tradeoff analysis, detailed engineering design, soil borings, sediment chemistry analyses, and preliminary tests of construction techniques has culminated in issuance of regulatory permits, authorization of the project by the Unified Port District, solicitation of bids, and contract award. During the two years required to complete these steps, escalation in dredging costs, aggravated by institutional delays, resulted in major increases in project cost. The low bid in April 1977 was approximately $2.5 million, about 60 percent higher than the 1975 cost analysis had projected. Construction is expected to take about two years and a salt marsh generation program may take another two to five years.
Keywords
Boats; Environmental factors; History; North America; Oceans; Reconnaissance; Sediments; Stress; Tides; Wildlife;
fLanguage
English
Publisher
ieee
Conference_Titel
OCEANS '77 Conference Record
Conference_Location
Los Angeles, CA, USA
Type
conf
DOI
10.1109/OCEANS.1977.1154346
Filename