DocumentCode :
2843348
Title :
Single machine group scheduling problems with deterioration and resource constrained setup times
Author :
Dazhi Wang ; Shixin Liu ; Yang Yan ; Dingwei Wang
Author_Institution :
Sch. of Inf. Sci. & Eng., Northeastern Univ., Shenyang, China
fYear :
2010
fDate :
26-28 May 2010
Firstpage :
3457
Lastpage :
3461
Abstract :
In this paper, we consider the single-machine group scheduling problems with deterioration and resource constrains. In this model, the jobs in the same group shouldn´t be separated, the setup time of a group is a positive strictly decreasing function of the amount of resources consumed, and the processing time of a job is a linear function of its starting time. The linear increasing deterioration model is considered. Two versions of objectives, minimizing the total resource consumption under the makespan constrains and minimize the makespan under the total resource consumption constrains, are discussed. Based on the characterizations of optimal schedules that established for both models, the optimal allocation methods are presented, respectively.
Keywords :
resource allocation; single machine scheduling; linear function; optimal allocation methods; resource constrained setup times; single machine group scheduling problems with deterioration; Delay effects; Educational programs; Fires; Information science; Job shop scheduling; Medical treatment; Optimal scheduling; Single machine scheduling; Temperature; Time factors; Deterioration; Resource constrained; Scheduling; Single-machine;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Control and Decision Conference (CCDC), 2010 Chinese
Conference_Location :
Xuzhou
Print_ISBN :
978-1-4244-5181-4
Type :
conf
DOI :
10.1109/CCDC.2010.5498565
Filename :
5498565
Link To Document :
بازگشت