    Renovation of a larger substation within existing spatial limitations without discounting operations

  • Author

    Gudmunds, S. ; Pehrsson, G. ; Öhlén, C.

  • Author_Institution
    Gothenurg Energy Ltd, Sweden
  • fYear
    1993
  • fDate
    17-21 May 1993
  • Abstract
    In an electric distribution system, there is a need for continual renovation of its substations. The reasons for this can be many; e.g. high maintenance costs, lack of spare parts, unsatisfactory operational safety or inadequate performance. In an account of the renovation of a larger substation presented by the authors, all of these factors were present as well as the need to change the high voltage level from 50 kV to 130 kV. They give an exposition of the new technology used in the project with attention to coordinated concepts for microprocessor based control, monitoring and protection
  • Keywords
    distribution networks; maintenance engineering; microcomputer applications; power system computer control; power system protection; project engineering; safety; substations; 130 kV; 50 kV; distribution system; maintenance; microprocessor; monitoring; performance; power system computer control; power system protection; project engineering; renovation; safety; substation;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Electricity Distribution, 1993. CIRED. 12th International Conference on
  • Conference_Location
    Birmingham
  • Print_ISBN
    0-85296-561-3
  • Type

    conf

  • Filename
    225657