DocumentCode
284450
Title
Experiences in installation and operation for a sub-station control and protection system
Author
Martínez, P. ; Azpiazu, L. ; Pietro, R. Di ; Rotaeche, Jon
fYear
1993
fDate
17-21 May 1993
Abstract
The authors describe how Iberdrola, the largest of Spain´s private electric power utilities has recently, in conjunction with the Electrotecnica Arteche Hermanos Company and the Basque Country University, completed the installation of an integrated control and protection system at its Castro la Plana transformer substation. The purpose of the present paper is to describe the most salient aspects of its commissioning, and the advantages achieved in the operation and maintenance of this new installation, with special reference to those aspects which have involved an improvement over installations that are based on conventional control and protection systems
fLanguage
English
Publisher
iet
Conference_Titel
Electricity Distribution, 1993. CIRED. 12th International Conference on
Conference_Location
Birmingham
Print_ISBN
0-85296-561-3
Type
conf
Filename
225659
Link To Document