• DocumentCode
    284450
  • Title

    Experiences in installation and operation for a sub-station control and protection system

  • Author

    Martínez, P. ; Azpiazu, L. ; Pietro, R. Di ; Rotaeche, Jon

  • fYear
    1993
  • fDate
    17-21 May 1993
  • Abstract
    The authors describe how Iberdrola, the largest of Spain´s private electric power utilities has recently, in conjunction with the Electrotecnica Arteche Hermanos Company and the Basque Country University, completed the installation of an integrated control and protection system at its Castro la Plana transformer substation. The purpose of the present paper is to describe the most salient aspects of its commissioning, and the advantages achieved in the operation and maintenance of this new installation, with special reference to those aspects which have involved an improvement over installations that are based on conventional control and protection systems
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Electricity Distribution, 1993. CIRED. 12th International Conference on
  • Conference_Location
    Birmingham
  • Print_ISBN
    0-85296-561-3
  • Type

    conf

  • Filename
    225659