Title :
A Method For Fast Replacement Of Wooden Utility Poles By Replacing The Bottom Half With A Concrete Module And Eliminating The Conventional Pole Top Transfer Costs
Author :
Begin, P.L. ; Walsh, J.E.
Author_Institution :
Interpace Corporation
Keywords :
Arm; Concrete; Costs; Land vehicles; Management training; Marketing management; Power transformer insulation; Road vehicles; Telephone poles; Testing;
Conference_Titel :
Transmission and Distribution Conference and Exposition, 1979. 7 IEEE/PES
DOI :
10.1109/TDC.1979.712753