• DocumentCode
    284569
  • Title

    Restructuring of the high-voltage system in a city-effects on the 10 kV system configuration and system operation

  • Author

    Petrossian, E. ; Kiok, M. ; Rittmeyer, E.

  • fYear
    1993
  • fDate
    17-21 May 1993
  • Abstract
    Various installations in a 60/10 kV city network have grown old as the system has expanded over the years; this leads to high maintenance and inspection costs. There is so far no other way of assuring the reliability and availability of supplies. Despite substantial support in the form of energy-saving measures implemented by the supply utility (and the resulting general slowing down of growth), there will be no alternative but to renew these installations. Further factors such as the closing down of a power plant (for reasons of environmental protection) necessitate additional expansion measures. The authors analyse the existing supply situation and report on restructuring in the 10 kV network and on the resultant possibilities offered by an expansion variant with 110/10 kV. The authors also describe how isolated installation renewal, together with coordinated practical planning of the medium and high-voltage levels can be the first step in building up a modern supply system for the future
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Electricity Distribution, 1993. CIRED. 12th International Conference on
  • Conference_Location
    Birmingham
  • Print_ISBN
    0-85296-561-3
  • Type

    conf

  • Filename
    225815