DocumentCode :
2846433
Title :
Practical Study on 5.2MW PV System in Sharp´s Kameyama Plant
Author :
Odagaki, K.
Author_Institution :
SHARP Co. Ltd., Nara
fYear :
2007
fDate :
2-5 April 2007
Firstpage :
1212
Lastpage :
1216
Abstract :
Activities of large-scale dispersed power supply systems installed on Sharp´s Kameyama Plant are introduced. This paper describes on energy delivery system, especially about the 5.2 MW PV system, and introduces specific technologies applied for the system, which is under study. The current operating data of energy delivery system in Kameyama Plant is also indicated.
Keywords :
distributed power generation; photovoltaic power systems; Sharp Kameyama Plant; energy delivery system; large-scale dispersed power supply systems; photovoltaic system; power 5.2 MW; Cogeneration; Fuel cells; Glass; Large-scale systems; Photovoltaic systems; Power generation; Power system protection; Production; Renewable energy resources; Solar power generation; Maximum Power Point Tracking (MPPT); Photovoltaic (PV) system; Qty control; Renewable energy systems;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Power Conversion Conference - Nagoya, 2007. PCC '07
Conference_Location :
Nagoya
Print_ISBN :
1-4244-0844-X
Electronic_ISBN :
1-4244-0844-X
Type :
conf
DOI :
10.1109/PCCON.2007.373120
Filename :
4239310
Link To Document :
بازگشت