DocumentCode
2846433
Title
Practical Study on 5.2MW PV System in Sharp´s Kameyama Plant
Author
Odagaki, K.
Author_Institution
SHARP Co. Ltd., Nara
fYear
2007
fDate
2-5 April 2007
Firstpage
1212
Lastpage
1216
Abstract
Activities of large-scale dispersed power supply systems installed on Sharp´s Kameyama Plant are introduced. This paper describes on energy delivery system, especially about the 5.2 MW PV system, and introduces specific technologies applied for the system, which is under study. The current operating data of energy delivery system in Kameyama Plant is also indicated.
Keywords
distributed power generation; photovoltaic power systems; Sharp Kameyama Plant; energy delivery system; large-scale dispersed power supply systems; photovoltaic system; power 5.2 MW; Cogeneration; Fuel cells; Glass; Large-scale systems; Photovoltaic systems; Power generation; Power system protection; Production; Renewable energy resources; Solar power generation; Maximum Power Point Tracking (MPPT); Photovoltaic (PV) system; Qty control; Renewable energy systems;
fLanguage
English
Publisher
ieee
Conference_Titel
Power Conversion Conference - Nagoya, 2007. PCC '07
Conference_Location
Nagoya
Print_ISBN
1-4244-0844-X
Electronic_ISBN
1-4244-0844-X
Type
conf
DOI
10.1109/PCCON.2007.373120
Filename
4239310
Link To Document