DocumentCode :
2848899
Title :
Decentralized task allocation with coupled constraints in complex missions
Author :
Whitten, A.K. ; Han-Lim Choi ; Johnson, L.B. ; How, J.P.
Author_Institution :
Dept. of Aeronaut. & Astronaut., MIT, Cambridge, MA, USA
fYear :
2011
fDate :
June 29 2011-July 1 2011
Firstpage :
1642
Lastpage :
1649
Abstract :
This paper presents a decentralized algorithm that creates feasible assignments for a network of autonomous agents in the presence of coupled constraints. The coupled constraints address complex mission characteristics that include assignment relationships, where the value of a task is conditioned on whether or not another task has been assigned, and temporal relationships, where the value of a task is conditioned on when it is performed relative to other tasks. The new algorithm is developed as an extension to the Consensus-Based Bundle Algorithm (CBBA), introducing the notion of pessimistic or optimistic bidding strategies and the relative timing constraints between tasks. This extension, called Coupled-Constraint CBBA (CCBBA), is compared to the baseline in a complex mission simulation and is found to outperform the baseline, particularly for task-rich scenarios.
Keywords :
aircraft control; decentralised control; multi-robot systems; remotely operated vehicles; task analysis; autonomous agent; complex mission characteristics; consensus-based bundle algorithm; coupled constraint; coupled-constraint CBBA; decentralized task allocation; optimistic bidding strategy; pessimistic bidding strategy; task-rich scenario; Fuels; Indexes; Planning; Protocols; Time factors; Timing; Vehicles;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
American Control Conference (ACC), 2011
Conference_Location :
San Francisco, CA
ISSN :
0743-1619
Print_ISBN :
978-1-4577-0080-4
Type :
conf
DOI :
10.1109/ACC.2011.5990917
Filename :
5990917
Link To Document :
بازگشت