Fuzzy Expert System for Determining the Criticality of Activities in Mega Projects
Author
Jassbi, Javad ; Jafari, Hasan ; Khanmohammadi, Sohrab
Author_Institution
Sci. & Res. Branch, Islamic Azad Univ., Tehran
fYear
2008
fDate
10-12 Sept. 2008
Firstpage
246
Lastpage
251
Abstract
In classic critical path method the criticality of activities are determined by the total floats. However in real world applications the criticalities of activities are also based on their effects on project duration, cost, quality and so on. Activities can have a degree of criticality which can be determined based on different combinations of some affecting variables such as time, risk and resource. After recognizing the impact factors, a fuzzy expert system is developed for determining the level of criticality of activities by using fuzzy inference system (FIS) based on the depository knowledge and experiences of connoisseurs. Behavioral analysis and conditional tests are used to verify the validity of the introduced fuzzy inference system. A construction project is considered as a case study for comparing the results of this method and the classic critical path method (CPM).
Keywords
critical path analysis; expert systems; fuzzy reasoning; project management; behavioral analysis; critical path method; depository knowledge; fuzzy expert system; fuzzy inference system; mega projects; Costs; Delay effects; Fuzzy sets; Fuzzy systems; Hybrid intelligent systems; Java; Mathematical model; Project management; Risk management; System testing; Behavioral Analysis; Conditional Test; Criticality; Fuzzy expert system;
fLanguage
English
Publisher
ieee
Conference_Titel
Hybrid Intelligent Systems, 2008. HIS '08. Eighth International Conference on
Conference_Location
Barcelona
Print_ISBN
978-0-7695-3326-1
Electronic_ISBN
978-0-7695-3326-1
Type
conf
DOI
10.1109/HIS.2008.65
Filename
4626637
Link To Document