DocumentCode :
2852941
Title :
A math-heuristic approach for integrated resource scheduling in a maritime logistics facility
Author :
Chen, Hua Xing ; LAU, Hoong Chuin
Author_Institution :
Sch. of Inf. Syst., Singapore Manage. Univ., Singapore, Singapore
fYear :
2011
fDate :
6-9 Dec. 2011
Firstpage :
195
Lastpage :
199
Abstract :
This paper addresses a real-world integrated logistics problem involving the servicing of vessels in a maritime logistics facility. It can be modeled as a job shop problem in which the operations of a job require not only a single machine, but also a set of equipment to be processed plus a large number of side constraints. We decompose the problem into a machine scheduling problem and an equipment allocation problem. The former sub-problem is solved heuristically that prune the solution space for the latter equipment allocation problem, which is solved by an exact mathematical model. We run this math-heuristic approach on a set of real industrial test cases and benchmark the results against a conventional heuristic approach.
Keywords :
facility location; job shop scheduling; marine engineering; equipment allocation problem; exact mathematical model; integrated resource scheduling; job shop problem; machine scheduling problem; maritime logistics facility; math-heuristic approach; real-world integrated logistics problem; Job shop scheduling; Logistics; Optimal scheduling; Processor scheduling; Resource management; Roads; Schedules; job shop; math-heuristic; scheduling;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Industrial Engineering and Engineering Management (IEEM), 2011 IEEE International Conference on
Conference_Location :
Singapore
ISSN :
2157-3611
Print_ISBN :
978-1-4577-0740-7
Electronic_ISBN :
2157-3611
Type :
conf
DOI :
10.1109/IEEM.2011.6117906
Filename :
6117906
Link To Document :
بازگشت