DocumentCode
2854179
Title
A Primary Evaluation for Applicability of IEC 62056 to a Next-Generation Power Grid
Author
Otani, Tetsuo
Author_Institution
Syst. Eng. Res. Lab., Central Res. Inst. of Electr. Power Ind., Tokyo, Japan
fYear
2010
fDate
4-6 Oct. 2010
Firstpage
67
Lastpage
72
Abstract
We are developing a next-generation power grid in the low-carbon era, which operates and controls demand-side equipment as well as that on the power generation and transmission sides. For these operations and controls, a computer unit, called a customer gateway in this paper, exchanges data with devices in customer premises and those in this grid. To ensure interoperability for communications with the customer gateway, a standard protocol such as IEC 62056 could be applied. The applicability of the latter for the customer gateway, however, remains to be ascertained. We specify the requirements for customer gateway communications in this paper. In addition, we show performance results measured using an experimental system with IEC 62056. Based on the requirements and results, we argue that IEC 62056 has no problem with respect to the transfer of data in bulk. In terms of latency, we must develop some methods to shorten the elapsed time and thus fulfill the requirements.
Keywords
IEC standards; internetworking; open systems; power engineering computing; protocols; smart power grids; IEC 62056; communication interoperability; customer gateway communications; demand-side equipment control; next-generation power grid; power generation; power transmission; protocol; Energy consumption; IEC standards; Logic gates; Power generation; Protocols; Time factors; Time measurement;
fLanguage
English
Publisher
ieee
Conference_Titel
Smart Grid Communications (SmartGridComm), 2010 First IEEE International Conference on
Conference_Location
Gaithersburg, MD
Print_ISBN
978-1-4244-6510-1
Type
conf
DOI
10.1109/SMARTGRID.2010.5622019
Filename
5622019
Link To Document